We are slowly making progress on the house. We have water and electricity hooked up. The painting and patching continue.
I had some big holes to patch, but I had a good helper for part of the job. Micah really enjoyed helping and did a very good job with the joint compound.
And it only took two coats of primer to cover the red paint. Let me just say that I was not an OU fan before I started on this project, and I am definitely not one after painting over all of that red. The boys’ room is now a very light shade of blue.
The white wall next to the desk is a whiteboard that they can draw on. It was a very narrow wall with a very large hole and we had some leftover whiteboard paneling, so it made for an easy fix.
Todd, Matthew, and I spent a very rainy afternoon working on the house. They planned to move the working toilet from the master bathroom (where the floor needs to be repaired to the other bathroom where the toilet flushed more water onto the floor than into the tank. I planned to touch up the paint in the boys’ room, because I always seem to leave a few thin spots.
I had already started painting when they realized that the cutoff valve for the toilet would not turn the water all the way off. Their solution was to turn off the power and therefore the pump. Did I mention that this was a very rainy day? I found myself with the lights off and very little light making its way through the gloomy clouds trying to find the spots that I had missed. These were places I had missed while painting on a sunny day with the lights on, so I decided to find something else to work on that would not strain my eyesight.
Of course, I needed to clean my paintbrush before the paint dried on it, but no water to the toilet meant no water to the sink. Then it hit me–there’s plenty of running water outside, falling from the sky. I found a good spot where the water was running off the edge of the roof and cleaned out the paintbrush.